PKPEEK Docs
Docs/Requirements & acquisition planning

Acquisition Actions: planning workspace

Assemble research, requirement, estimates and review into a versioned plan; prepare follow-on acquisitions (AP01, AP02).

Acquisition Planner · Contract specialist · Contracting Officer

/pdcc/acquisitions/actions
Live walkthrough · Acquisition Actions: planning workspace
/pdcc/acquisitions/actions
/pdcc/acquisitions/actions?screen=AP01
/pdcc/acquisitions/actions?screen=AP02

Acquisition Actions (Acquisition Planning module) is where a planner assembles a versioned acquisition plan. It works with Core plus an accepted external research package — Market Research and Scout are not required.

Planning workspace (AP01)

Plan
e.g. PLAN-026-007.
Need
Linked requirement, e.g. REQ-026-007.
Research input
e.g. *External report version 2 accepted*.
Current draft
Draft number (e.g. 5).
Owner
Plan owner.
  1. 1

    Open the plan

    Acquisition Actions › select a plan.

  2. 2

    Review research input

    Cite accepted research; remove or refresh it if needed.

  3. 3
  4. 4

    Prepare IGCE

    Build the independent government cost estimate.

  5. 5

    Package and submit

    Run preflight and submit for review.

Prepare a follow-on acquisition (AP02)

Start from a prior contract (e.g. CT-DEMO-007): select current evidence, record lessons (e.g. *Pilot test evidence remains incomplete*) and identify scope changes. Click Create planning draft.

Heads up — A follow-on draft does not extend the existing contract, commit funds or presume a particular vendor.